Six questions to ask before you sign.

General answers to help you see clearly. Your own project may call for a different answer.

What does the French ten-year liability (garantie décennale) cover?

For ten years from handover, the builder is liable for damage that undermines the building’s structural soundness or makes it unfit for its purpose: a structural crack, say, or a leak that leaves a home uninhabitable. Every builder must be insured for this liability. Before you sign, ask for the insurance certificate and check that it covers the work planned. The client, for their part, is in principle required to take out building damage insurance (dommages-ouvrage).

What is handover (réception des travaux)?

It is the act by which the client accepts the building, with or without reservations, usually during a joint inspection with the contractor. It starts the legal warranties running: one-year completion, two-year equipment and ten-year structural. Record every visible defect in the handover report: a reservation left out is hard to enforce later.

One general contractor, or separate trade packages?

With separate packages, you sign with each firm, and someone, often the architect or project engineer, coordinates their work. With a general contractor, one contract covers every trade and the contractor takes on the coordination. The first gives you more control over each package; the second simplifies management and reduces interfaces. The right choice depends on the size of the project, your own team and your design team.

What do roads and utility networks (VRD) cover?

VRD stands for voirie et réseaux divers: everything that serves a plot of land or a building. On one side, roads, pavements and parking areas; on the other, the networks for drinking water, wastewater and rainwater, electricity and telecommunications. Part of the work is done before the building goes up (earthworks, trenches, connections), the rest afterwards (surfacing, external works).

What does RE2020 mean for a new building?

RE2020 is France’s environmental regulation for new buildings; it replaced RT 2012. Beyond energy use, it takes account of the building’s carbon footprint over its whole life cycle and of summer comfort, with requirements that tighten in stages. It is decided at design stage, in the thermal and environmental studies, and then on site, which must carry out what those studies specify.

Why carry out an asbestos survey before works?

Before works on a building constructed before July 1997, the client ordering the works must have an asbestos survey carried out, suited to the works planned. If it finds asbestos, its removal is entrusted to a contractor certified for this work and follows a removal plan. Asbestos removal then comes before the other works: it is planned while the job is prepared, not once the site is under way.